Botanic Garden Bank Stabilization
Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Status
Accepting Bids
Prebid Date | 4/15/25 11:30am |
Bid Date | 5/7/25 2:00pm |
Location
The Project is located at 1550 Wildcat Canyon Road Berkeley, CA 94708
Estimated Cost. The estimated construction cost is $230,000.
A bidders’ conference will be held on April 15, 2025, at 11:00 AM, at the following location: Regional Parks Botanic Garden, Tilden Regional Park – 1550 Wildcat Canyon Road Berkeley, CA 94708 to acquaint all prospective bidders with the Contract Documents and the Worksite. The bidders’ conference is mandatory. A bidder who fails to attend a mandatory bidders’ conference will be disqualified from bidding.