Botanic Garden Bank Stabilization

Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Addendum 1 (click to expand/collapse)
Name Size
Addendum 1_04.23.2025 2.6 MB