Botanic Garden Bank Stabilization
Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum 1_04.23.2025 | 2.6 MB |