Botanic Garden Bank Stabilization

Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Plans (click to expand/collapse)
Name Size
2025.04.07 TBG 100pct Plans 2.7 MB