Botanic Garden Bank Stabilization
Description described as follows: Creek bank biotechnical bank stabilization, including placement of rock, vegetated soil lifts, revegetation, and irrigation. Developing an access route on steep terrain, dewatering and site cleanup.
Plans
(click to expand/collapse)

Name | Size | ||
2025.04.07 TBG 100pct Plans | 2.7 MB |